Call [PHONE] Get a quote
Wicker chairs and a small table on a deck with a wooden railing

Decks

Deck building and repair in Seattle

New decks, rebuilds and repairs for homes in Seattle and up to 50 miles around: footings, frame, boards, railing and stairs, built to your city’s code.

  • A typical build

    1 to 3 weeks

    On site, after the permit where one is needed.

  • How long it lasts

    15 to 50 years

    By the boards: each one below says.

  • Our warranty

    [YEARS]

    On the work; composite and PVC boards carry the maker’s too.

  • Your quote

    A drawing and a price

    The size, the boards, the railing and the stairs, in writing.

Boards

Composite or cedar

The frame under almost every deck is pressure-treated lumber. The boards on top are the choice: price now against upkeep later.

  • Lowest cost

    Pressure-treated

    Pine or fir treated against rot, the usual wood for the frame under any deck.

    Lasts

    15 to 25 years, with care

    Good

    • The lowest price
    • Strong and easy to repair
    • Takes a stain of any colour

    Watch for

    • Checks, splits and warps as it weathers
    • Cleaned and sealed every 2 to 3 years
    • Splinters when left bare
  • Natural wood

    Cedar

    Western red cedar boards: light, straight and fragrant.

    Lasts

    15 to 25 years, with care

    Good

    • A beautiful natural colour and grain
    • Resists rot and insects by nature
    • Stays cooler under bare feet than plastic boards

    Watch for

    • Soft: it dents and scratches
    • Stained or sealed every 2 to 3 years, or it turns grey
    • Costs more than pressure-treated
  • Low upkeep

    Composite

    Wood fibre and plastic with a hard outer shell. Trex and TimberTech are the best known.

    Lasts

    25 to 50 years

    Good

    • No staining or sealing: wash it twice a year
    • No splinters and no rot
    • Long warranties on the boards from the makers

    Watch for

    • Costs much more up front than wood
    • Gets hot in full sun, dark colours most
    • Wash it in spring and autumn: shade and needles let mildew start on the surface
  • Least upkeep

    PVC

    All-plastic cellular boards with no wood inside. Azek is the best known.

    Lasts

    30 to 50 years

    Good

    • Takes up no water: good in shade and by a hot tub
    • Light, stain resistant, never sealed
    • Holds its colour well

    Watch for

    • The most expensive boards
    • Grows and shrinks with heat, so the gaps must be right
    • Feels less like wood, and warm in the sun

Railings

The railing changes the whole deck

A railing is priced by the foot and can cost as much as the boards. Every one keeps the 4 inch rule: no gap a small child could slip through.

  • Wood

    The least costly, and it matches a wood deck. It needs the same staining as the boards.

  • Aluminum

    Powder coated in many colours, no upkeep, and a clean look that lasts.

  • Composite or vinyl

    Matches a composite deck, with the same low upkeep.

A carpenter fitting boards onto a wooden frame

Permits

Permits, footings and the code

In Seattle a deck more than 18 inches above the ground needs a building permit, and so does a deck of any height in an environmentally critical area. Other cities set their own rules: we check them for your address and say in the quote what the permit needs.

  • A guardrail at least 36 inches tall on any deck more than 30 inches above the ground, with no opening of 4 inches or more
  • Footings on solid ground, below the frost line
  • A ledger bolted to the house and flashed, never just nailed, so the deck does not pull away in an earthquake
  • Even stairs: risers up to 7 3/4 inches, treads of 10 inches or more, 36 inches wide, and a handrail 34 to 38 inches high from four risers up

How it works

How a deck gets built

A builder in a sun hat working on a new deck frame
  1. 01

    Visit and measure

    We look at the spot, the ground and the wall the deck meets, and measure.

  2. 02

    Drawing and quote

    The size, the boards, the railing, the stairs and the price, in writing.

  3. 03

    Permit

    Where one is needed, it is applied for before any digging starts.

  4. 04

    Footings and frame

    Footings, posts, beams and joists, the ledger bolted and flashed.

  5. 05

    Boards, railing, stairs

    The boards with the right gaps, then the railing and the stairs.

  6. 06

    Inspection and walk-through

    The city’s final inspection where there is a permit, then we walk it with you.

Price

What the price depends on

Every deck is quoted in writing after a visit. A typical range for this area: [PRICE RANGE PER SQUARE FOOT, BUILT].

  • Size and height

    A bigger deck costs more in all and less per square foot. A high deck needs more posts, bracing and railing.

  • The boards

    Pressure-treated costs least, then cedar, then composite and PVC.

  • The railing

    Wood costs least, then aluminum, cable and glass.

  • Stairs and levels

    Each flight of stairs, landing or second level adds framing and railing.

  • The old deck

    Taking down and hauling away an old deck, or keeping a sound frame and putting new boards on it.

  • The ground

    Slopes, rock, roots, a tight yard and how far material is carried.

Two wicker chairs on a deck by a wooden railing and trees

After the job

Warranty and care

[WORKMANSHIP WARRANTY: HOW MANY YEARS, AND WHAT IT COVERS]. Composite and PVC boards carry their makers’ warranty on top.

  • Sweep off leaves and needles: they hold water against the boards
  • Wash composite and PVC twice a year with soap and a soft brush
  • Clean and re-seal wood every 2 to 3 years
  • Look over the stairs, the railing posts and the ledger once a year

FAQ

Deck questions

Can you put new boards on my old deck?

Sometimes. When the frame, the footings and the ledger are sound, new boards and a new railing can go on the old frame. We check them first.

Composite or wood?

Wood costs less to build. Composite and PVC cost more but save years of staining and sealing. The quote can price both.

How long does a deck take?

One to three weeks on site for most decks, plus the time the city takes with a permit where one is needed.

Do I need a permit?

In Seattle, for a deck more than 18 inches above the ground or on a roof. Other cities set their own rules; we check them for your address.

When does a deck need a railing?

In Seattle, for a deck more than 18 inches above the ground or on a roof. Other cities set their own rules; we check them for your address.

What happens to the old deck?

It is taken down and hauled away, unless its frame is sound enough to keep.

Are you licensed and insured?

Licensed in Washington: [LICENCE NO.]. Insurance: [WHAT IS CARRIED, AND THE BOND].

Ready for a new deck?

Send the size you have in mind and a photo of the spot.